Currently viewing the category: "Alumax Mt Holly"

If you are executing Preventive Maintenance on equipment that continues to break down or your maintenance cost continues to increase I recommend you read this article on the 10% Rule of Preventive Maintenance. This short explanation of the 10% Rule of PM may be what you need to take that next step […]

Continue Reading

“The  best way to predict the future is to create it”
–  Peter  Drucker

How does an organization evolve to the next level of Maintenance and/or Reliability Maturity? This question has been asked by Maintenance and Reliability Managers for as long as I can remember. Over the years I have […]

Continue Reading

Proactive Maintenance Foundational Requirement # 1 –  “Striking the Right Balance Between PM and PdM”

Having the right balance between PM and PdM is key to successful identification of proactive work. Identify how the PF Curve works with Proactive Maintenance vs Reactive Maintenance . The early detection of a defect on […]

Continue Reading

 By John Day, PE – Engineering and Maintenance Manager for Alumax Mt Holly 1979-1998

 

INTRODUCTION

Alumax of South Carolina is an aluminum smelter that produces in excess of 180,000 MT of primary aluminum each year.  It began operation in 1980 after a 2-year construction phase.  The plant is the last greenfield aluminum […]

Continue Reading

MAINTENANCE MANAGEMENT PHILOSOPHY  -1979

Alumax Mt Holly

by John Day PE, Maintenance and Engineering Manager

(1 of 3 plants worldwide ever to be certified as ”World Class Maintenance”)

Alumax of SC began development of the maintenance management concept with […]

Continue Reading
Set your Twitter account name in your settings to use the TwitterBar Section.